Construction progress at Ilioara Residence

How far the building has got, stage by stage. We publish photographs taken on site as the works advance: no renderings, just how the site looked on the day we were there.

Where we are now

Completion scheduled: December 2026

The structure is up to the top level. Work is under way on the blockwork, the internal walls and the façade.

Done · 4/4Site preparation and foundation
  1. Done

    Site set-up

  2. Done

    Demolition of the old building

  3. Done

    Excavation

  4. Done

    Preparing and pouring the foundation slab

Done · 2/2Structural frame
  1. Done

    Columns and concrete structure

  2. Done

    Setback 9th floor and roof

In progress · 2/7Envelope and building services
  1. Done

    Masonry and partitions

  2. Done

    Roof terrace waterproofing

  3. In progress

    Facade and external insulation

  4. In progress

    Wall plastering

  5. In progress

    Utility connections

  6. Next

    Triple-glazed windows

  7. Next

    Services and underfloor heating

Next · 0/3Finishes and handover
  1. Next

    Interior finishes

  2. Next

    Lift, parking and outdoor works

  3. Next · December 2026

    Acceptance and key handover

From the site

Most recent

Facade priming and preparation

The facade is primed before render and insulation — the layer that keeps everything bonded for years.

11 photos

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

  • Facade priming and preparation — Ilioara Residence

Scaffolding and facade

Scaffolding is up along the full height of the building, for the facade works.

10 photos

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

  • Scaffolding and facade — Ilioara Residence

Wall plastering

Interior walls are plastered, ready for skim coat and finishes.

9 photos

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

  • Wall plastering — Ilioara Residence

Utility connections

Connections to the city networks: water, sewerage, service links.

3 photos

  • Utility connections — Ilioara Residence

  • Utility connections — Ilioara Residence

  • Utility connections — Ilioara Residence

Roof terrace waterproofing

The terrace gets its waterproofing — the work that decides whether the top floor stays dry for years.

12 photos

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

  • Roof terrace waterproofing — Ilioara Residence

Concrete and masonry

Concrete elements are poured and the enclosing masonry goes up, level by level.

9 photos

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

  • Concrete and masonry — Ilioara Residence

Monthly archive

July 20261 update · 4 photos

Masonry and partitions

The concrete frame is up across every level, and the external masonry and internal partitions are being built. Scaffolding is in place for the facade works.

4 photos

  • Masonry and partitions — Ilioara Residence

  • Masonry and partitions — Ilioara Residence

  • Masonry and partitions — Ilioara Residence

  • Masonry and partitions — Ilioara Residence

Want to see the site with your own eyes? We'll arrange a visit.